Commercial Art / Art and Industry, September 1932 – page 36
- Magazine
- Commercial Art / Art and Industry
- Issue date
- September 1932
- Page
- 36
- Department
- Magazines and journals
- Object number
- CAI_1932-09-01_p36
Text on this page (OCR)
af
1
te
T
| aie
tee
|
Switchroom controlling the electric current for
light and power
both, and any showing flaws or weakness
are promptly rejected. Following this,
the material is placed in store, to be
issued later to the machine shops, as
directed by the Production Control
Department. The issue of castings, metal,
etc., is made in the requisite quantities
called for by the various programmes of
chassis proceeding through the factory,
where all the work is arranged on the most
progressive plan, so that it passes smoothly
forward stage by stage. In the machine
halls, electrically driven machines are
conveniently located in groups to deal
with special sectionised classes of work.
A line of power tools is engaged on the
work of making back axles, and for speed
in production, single machines bore and
fix rear axle bowls and banjos, two at a
time. For ease in handling heavy parts,
like those just mentioned, throughout the
factory overhead compressed air hoists
are in use, thus operatives are enabled to
handle and place heavy work into position
without undue fatigue. Other machines
drill and ream the rear and front hubs,
and others again counter bore ten bolt
holes at one operation.
On the front axle section are machines
for milling and drilling, and here many
118
of the operations connected with the
steering gear and braking equipment are
also carried out. So the work proceeds.
Carefully, speedily and progressively, the
chassis is developing with typical thor-
oughness, and at every stage of its con-
struction the strictest examination and
scrutiny is given to every part of the work.
In one section, lines of machines are
concentrated on the production of crank-
shafts. Here also are found power
grinders in which all the movements are
hydraulically controlled; an arrange-
ment which effects an enormous saving
in fatigue on the part of the operatives.
In connection with the manufacture of
crankshafts at the terminal point of this
particular part of the works, an electrical
balancing machine is installed enabling
the slightest inaccuracies to be detected
and rectified.
As the many and various processes of
machining are carried out, the work, all
the time, progressively moves forward to
the assembly lines, where the multifarious
parts are built into units—engines, gear-
boxes, steering gear, brake sets, springs,
bonnets, dashboards, etc. All these units
are then conveyed by rollerways and
The first step in making a bus lorry chassis is the
examination of all raw material for weaknesses or
flaws, in the factory laboratory
Opposite : Moving conveyor with long arms for ex-
tracting the moulds and depositing them where
required
Rough castings, such as cylinder blocks, brakes, drums
and steering bosses, are first pickled to removed sand
and clean the surfaces
NC