Architectura, 14 August 1926 – page 5
- Magazine
- Architectura
- Issue date
- 14 August 1926
- Page
- 5
- Department
- Magazines and journals
- Object number
- ARC_1926-08-14_p5
Text on this page (OCR)
The league of Nations reserves the right to publish the designs obtaining prizes
and supplementary awards.
Execution of the Design. The League of Nations may require the author of the
design placed first on the list by the Jury and accepted by the League of Nations
to make changes in his design.
Should the League of Nations fail to execute the design or decide, before detailed
plans for its execution have been drawn up, not to continue negotiations with the
author, the latter will receive 50,000 Swiss francs as sole compensation.
Fees. The fees payable to the architect selected to erect the building will be at the
rate of 5 per cent of the total cost of erection and of any furniture which the archi-
tect may be asked to design.
These fees will cover all the work generally undertaken by architects, as specified
in the Scale of Fees of the Swiss Association of Engineers and Architects sup-
plied to competitors.
Public Exhibition of Designs. After the prizes and supplementary awards have
been given, all the designs accepted for the competition will be publicly exhibited
for not less than a fortnight.
Prizewinners’ names will be attached to their designs.
The names of competitors obtaining supplementary awards will not be published
unless they so request.
Al the close of the exhibition, the sealed envelopes accompanying the designs
which have not obtained awards will be opened by a representative of the Secret-
ary-General, who will be bound to secrecy.
Subject to such delay as may be rendered necessary by the proposed publication,
all designs except those obtaining the first, second and third prizes will, after the
close of the public exhibition, be sent back to their authors by and at the expense
of the League of Nations.
De jury bestaat uit de heeren:
M. H. P. BERLAGE (The Hague);
Sir JOHN J. BURNET (London);
‚ CHARLES GATO (Madrid);
JOSEPH HOFFMANN (Vienna);
VICTOR HORTA (Brussels), President;
CHARLES LEMARESQUIER (Paris);
KARL MOSER (Zurich);
ATTILIO MUGGIA (Bologna);
IVAR TENGBOM (Stockholm).
SESSSSS
Should any member of the Jury be unavoidably prevented from taking part in the
deliberations, his place will be taken by a substitute member of the same nationality.
Substitute members:
M. W. KROMHOUT (Renkum-Arnhem);
Mr. H. S GOODHART-RENDEL (London);
M. PASCUAL BRAVO (Madrid);
M. EUGEN STEINHOEF (Vienna);
M. FRANZ DE VESTEL (Brussels);
M. GABRIEL HERAUD (Paris);
M. CAMILLE MARTIN (Geneva);
M. G. B. MILANI (Rome);
M. ERIK LALLERSTEDT (Stockholm).
Verder omvat het volledige programma:
1°. Plan van Geneve 1 : 15000.
2°. Een situatieplan 1 : 500. Deze druk meet ongeveer 1 X 2 Meter.
2a. Een supplement hierop 1 : 1000. Deze druk meet ongeveer 0.70 X 1 Meter.
387