Commercial Art / Art and Industry, July 1939 – page 28
- Magazine
- Commercial Art / Art and Industry
- Issue date
- July 1939
- Page
- 28
- Department
- Magazines and journals
- Object number
- CAI_1939-07-01_p28
Text on this page (OCR)
order is placed the Studio is again requisitioned to do
its final job, which is the preparation of the working
drawing. This consists of splitting the display into its
component parts and reducing them to scale drawings
much in the same way that a paper pattern is used in
dressmaking, only in this case the timber takes the
place of the cloth.
MATERIALISING THE DESIGNS
These drawings are then “ put in hand” at the
Works and an order bag made out. This order bag
carries a specific sequence number and is in reality an
out-size envelope with a printed face which carries the
order number, the client’s name, date of delivery,
special instructions, etc., etc., and all materials and
labour costs are entered, whilst inside are carried
duplicate drawings, colour samples for matching, etc.,
so that at any time this bag is a complete progress
record of the work done for this unit.
First in order of work is the battened framework
which usually consists of 2 by I in. prepared (planed)
batten cut to length and assembled. ‘This is then
covered to shape with what is commonly known as
3 ply, and although this item is associated with three
glued laminations of plywood, each one millimetre
thick, the more common practice is to use four or six
millimetre ply to ensure rigid construction.
For small units the battens are often dispensed with
and plywood of 9 millimetres in thickness is used,
which is sufficiently robust to need no support.
Having covered the framework with ply the unit is
then “‘ filled.”’ This is actually two operations. The
first is the punching down of all nails and panel pins
just below the surface of the ply and the resulting hole
SEMI-PERMANENT DISPLAY
Below, right :
Pavilion at the Paris Exhibition.
General colours were red, cream and_ black. Below, left:
An expression of technical appeal is here possible, as the
observer has more leisure to appreciate detail than in the case
of window units. Under these conditions, it is also possible
to impose restraint upon the colour scheme (carried out in
cream ground, black and red lettering, polished gaboon maho-
gany floor). Displayneeds in collaboration with Misha Black of
Industrial Design Partnership, for the Gas Light & Coke Co.
THE MEDI
PPROERE
CONDEM
FLUELES
th.
THHEERDORD
THE ROYAL COLLEGE OF PHYSICIANS
SAYS THAT THE AIR IN A FLUELESS
ROOM IS NOT CHANGED MORE THAN
ONCE IN AN HOUR- NOT SUFFICIENT
FOR HEALTHY CONDITIONS
ABOUT 600 CUBIC FEET AN HOUR
ARE NEEDED FOR EVERY PERSON
IN A ROOM. THIS CAN NOT BE
PROVIDED WITHOUT A FLUE
22
Unit production by Displayneeds, in conjunction with Misha Black of Industrial Design Partnership, for the Peace
Cut-out lettering was here the main theme, and type recessed inside the arrow was illuminated.
A display of a semi-permanent nature for the Building Centre.
ee
RITOIR
© §0U8
MANDAT
TONS QUI?
E SONT PAS
MEMBRES ©
ONS 0
MEMBRES ©
"ELA SOCIETE
"E NATIONS
DES NATIONS