AD Magazine, August 1941 (no. 7-6) – page 51

AD Magazine, August 1941 (no. 7-6) – page 51
Magazine
AD Magazine
Issue date
August 1941
Issue
7-6
Page
51
Department
Magazines and journals
Object number
AD_1941-08-01_p51

Text on this page (OCR)

@ Several hundred rough pencil sketches are made
by the story sketch artists. These drawings, on
white paper, are arranged in rough continuity. They
give an outline of the entire story and show the
principal sequences and gags. These rough sketches
take the places of the written scenarios in the
ordinary picture production. When the original idea
has been capitalized to the limit a final conference
is called. The director, the musical director and
animators sit in with the story department as one
of its members explains the story and gags. Sug-
gestions, criticism, and at times changes in the
story, are made.


@ The director will now make a careful estimate
of the time to be required for each sequence as
indicated by the story roughs. Working with a
metronome and stopwatch he clocks every bit of
action in the story. Above the director holds a
stopwatch as his assistant goes through a bit of
pantomime paralleling an action called for in the
roughs. He figures the time required, to a split
second, and records it on a ‘‘music detail sheet."
This timing is checked and rechecked by the direc-
tor. Nothing is left to chance. Everything is worked
out in advance


@ The director and his assistants plan every detail
of the film, picture by picture, editing the story to
fit the time required for a bit of action. They
decide on the size of the field of action and deter-
mine how much of the characters are to be seen in
each drawing, as well as how many frames of film
can be used for each scene. They tell where there
shall be music, and with the musical director set
the tempo. Sound effects are indicated and dia-
logue is given

Open this record in the IADDB collection viewer