Commercial Art / Art and Industry, April 1932 – page 10
- Magazine
- Commercial Art / Art and Industry
- Issue date
- April 1932
- Page
- 10
- Department
- Magazines and journals
- Object number
- CAI_1932-04-01_p10
Text on this page (OCR)
eee SOE ogee
macnn ewes ws siircun eet
“ate eM.
Tilbury passenger landing stage—general view from Tilbury Hotel
The new Port Authority immediately
drew up a comprehensive and progressive
programme for the improvement and
expansion of the port. ‘The first stage
embraced works of an urgent character,
and included the construction of new
transit and storage sheds, cold stores,
pumping installations to increase the
depth of some of the docks, the extension
of existing dry docks and similar works
immediately required to increase the
efficiency of the port for its then existing
trade ; the river channels from the sea
to the heart of London were widened and
deepened. The second stage was designed
to expand the accommodation of the port
Photo, Aerofilms
Tilbury Docks
YOUR EXISTENCE AND YOUR TRADE DEPEND ON EFFICIENT