Commercial Art / Art and Industry, February 1932 – page 23

Commercial Art / Art and Industry, February 1932 – page 23
Magazine
Commercial Art / Art and Industry
Issue date
February 1932
Page
23
Department
Magazines and journals
Object number
CAI_1932-02-01_p23

Text on this page (OCR)

Cars and Comfort


It is needless, to dilate upon passenger
accommodation and other features with
which the public is familiar. Recently,
new and diverse colour schemes have been
introduced into car interiors. Variety is
preferable to monotony, and the latter is
apt to arise through daily travel in cars
of uniform paintwork and upholstery.


On withdrawal from traffic the cars
have a clean-up by vacuum cleaner and
wash-leather ; whilst the exterior is
treated by the cars being passed slowly
through special washing-machines, when
whirling pads and jets of water are brought
to bear upon the sides. Ordinary running
and maintenance details are conducted
in the depots attached to the individual
lines. Overhaul of each car is carried out
periodically in the central overhaul depot
at Acton.


The Stations


Station-platform tunnels—e21 ft. 23 in.
in diameter, compared with the 11 ft.
81 in. of running-tunnels—are excavated
by a shield of corresponding size. ‘The
escalator tunnels and the passages, etc.,
are bored by hand, the former being


enlargements of small tunnels that are
first bored through the site.


The escalator itself is an endless belt
of steps. It is driven by an electric motor
—installed in the machinery chamber at
the upper landing—and the steps are
brought into position automatically. The
invert of the tunnel forms a crypt, with
stone stairways extending the full length
and thus giving access to the under part
of the “‘ belt,” for inspection, etc.


Reconstructing old stations is generally
a more involved job than building new
ones. The sites are congested, under-
pinning of buildings is entailed, and
traffic above and below ground must not
be hindered. ‘The new Piccadilly Circus
Station is a case in point. Under the road-
ways here was a tangled skein of public-
service mains, all of which had to be
duplicated before the real work of station
construction could begin. . Here—as at
the Bank and as will be the case at the
new Marble Arch Station—a special pipe
subway had to be built around the station
site to contain the water and electricity
mains. Contingencies of this sort are
public benefactions, as they obviate any
further breaking up of roadways for mains


NON-STOP


a


The Baths for the Cars


FACIEITIES FOR QUICKLY AND EFFICIENT LY CEEANING TRANS

Open this record in the IADDB collection viewer