forms; the forming of a new tunnel
under the Broadway, and of new cuttings,
etc., in the vicinity, are details of work
that is being done piecemeal amid a
maelstrom of traffic. At Hammersmith
the Underground traffic is represented
by 1,457 trains a day, and the Under-
ground day is nineteen hours. ‘The mea-
sure of street traffic baffles calculation.
Power
Power is the driving force. Without it
there is no functioning—no service ! The
Lots Road power house is the heart of the
Underground. It was designed to give
ample reserve of power. ‘That was in 1904,
and the eight 6,000 kw. turbo-alternators
were the biggest installation of the kind
in the world.
To-day there are nine 15,000 kw. sets,
representing 185,000 h.p. ‘The average
daily output is 1,200,000 kilowatts, the
coal consumption is 825 tons, and for each
turbine in service 21,000 gallons of water
are used per minute for condensing pur-
poses alone. Electricity is generated at
11,000 v. alternating current and distri-
Piecemeal reconstruction at Hammersmith Station. Every day marks a chavge
Preparing the four-track road west of Hammersmith
buted to more than forty substations,
scattered over the system. ‘These are the
satellites of the power house, and in them
the high-tension current is converted and
transformed to 600 v. direct, for traction
purposes, or to other voltages as may be
required. Some of the substations are of
the remote-control type, that is, they are
operated from another substation some
distance away. Attendants are not needed,
and ingenious devices prevent or adjust
faults.